PROGRO RECENT NOTABLE PROJECTS

  • B&G Pipeline – Dominion Energy Co. LLC, Rutherford and McDowell County, NC. Clearing, grubbing, and tree trimming of 36,000 LF of ROW including clearing of access roads.
  • B&G Pipeline – Dominion Energy Co. LLC, Buncombe County, NC. Clearing, grubbing, tree trimming, in addition to hauling and placement of timber mats on a project approximately 60,000 LF of in length.
  • Beitzel Corp –  XCL Michter Lateral, Marshall County, WV, 1100 L.F. of clearing.
  • Brex Enterprises – EQT Mobley Storage Well, Wetzel County, WV. Clearing and grubbing 44 acres of a well site pad and installation of over 10,000 LF of compost filter sock.
  • Brex Enterprises – Enterprise Products, Eastern Pennsylvania.  Tree trimming and ROW maintenance on approximately 20 miles of pipeline right of way.
  • Cabot Oil and Gas – Austin E. Well Site, Susquehanna County, PA, Clearing and grubbing of a 16 acre well site.
  • Capstone Energy – Energy Transfer Hardy East Project, Bradford County PA, Clearing and grubbing of 8800 L.F. of gas line ROW.
  • CNX Midstream – NV15 and SHL1 Slip Repair Greene County, PA. Slip remediation including excavation, blending lime and drain installation.
  • DTE Appalachia Gathering, LLC – Mine Subsidence Prevention, West Virginia. Excavation, monitoring, and backfill of previously installed gas line.
  • Elite Midstream Services – EQT Wind Ridge Project, Cameron, WV. Installation of stream crossing and miscellaneous erosion control devices.
  • Energy Services South – Throckmorton to Stattler Road, Greene County, PA.  Regrading and restoration of 17,701 LF of ROW. Installation and removal of erosion control devices.
  • Energy Transfer – Step Installation, Washington County, PA. Installation of pre-built steps.
  • Eureka Midstream – Jaws and Pool Projects, Monroe County, Ohio.  Approximately 5000 LF of clearing, erosion control devices, timber mats and restoration.
  • Eureka Midstream – Bobcat and Valenka Projects, Monroe, County, Ohio.  Approximately 6600 LF of clearing, erosion control devices, timber mats and restoration.
  • EQM Gathering – NIJU S030 Washington County, PA.  Erosion berm modification and installation.  Installation of erosion control devices and final restoration.
  • EQM Gathering – NIJU S030 Washington County, PA.  Construction of pond and access road modification. Installation of erosion control devices, pond excavation, rock lined ditch, outlet structure and final seeding.
  • EQM Gathering – NIJU S030 Washington County, PA. Installation of gabion basket retaining wall. Project included final paving, seeding and restoration along with a stream diversion pump system.
  • Equitrans Midstream – Robert to Turner, Monroe County, Ohio – Approximately 3400 LF of clearing, erosion control devices, timber mats and restoration.
  • Equitrans Midstream – Titan to Walters, Belmont County, Ohio – Approximately 8500 LF of clearing, erosion control devices, timber mats and restoration.
  • Equitrans Midstream – NIST H004, Belmont County, Ohio – Approximately 9000 LF of clearing, installation of erosion control devices, stream crossings and temporary restoration.
  • Gas Field Specialist – DTE Matteo – Mepco Tie In, Monongalia County, WV. Clearing and grubbing of 360 LF of ROW and installation of erosion control devices.
  • GasSearch – Cabot Oil & Gas, Eastern Pennsylvania.  Clearing and grubbing of various well pad locations.
  • GW Ridge – DTE Y2M – McClellan – Approximately 28,000 LF of clearing and grubbing, installation of erosion control devices, stream crossings, timber mat placement, and construction of RCEs
  • Lineal Industries – MarkWest Gas LLC, Zilkowski to Dablo, Allegheny County, PA. Approximately 8800 LF of clearing and grubbing.
  • LPR Energy – Polk Pipeline, Fayette County, PA. Approximately 13750 LF of clearing, installation of erosion control devices, stream crossings, timber mat placement, plant installation, final seeding, and restoration.
  • Ryan Environmental – MarkWest Gas LLC, Coffield Mine Subsidence Pipeline Project, Cameron County, WV. Approximately 3000 LF of clearing and grubbing.
  • Troy Construction – Duke Energy Line 326 Phase 2, Winston Salem N.C., Approximately 7000 LF of clearing and timber mat stream crossing.

 

COMPANY AFFILIATIONS / CREDENTIALS

  • WV Contractor’s License
  • OSHA 10/30 Construction
  • OSHA Authorized Trainer – Construction/General Industry – 500/501/502
  • CPR/First Aid Certified
  • TCIA – Certified Tree Safety Professional (CTSP)
  • BCSP – Construction Health & Safety Technician (CHST)
  • Member: ISNetworld #400-411862
  • Member: Veriforce #23841
  • Member: PEC Safety #77374
  • Current Memberships with the following DOT Drug and Alcohol Compliance Services: PTC, DISAWorks, TPS Alert, NCMS